Asbestos

 

Asbestos: Resilient Floor Covering Removal Supervisor

Floor Covering Removal Supervisor (am) / 4hr. (1) physical characteristics of asbestos and ACBM; (2) potential health effects related to asbestos exposure; (3) relevant federal, state, and local regulatory requirements; (4) general rules for removal of resilient floor covering; (5) alternatives to removal of existing resilient floor coverings; (6) removal of resilient sheet flooring; (7) removal of resilient tile; (8) removal of residual adhesive; (9) complete removal of wood underlayment; (10) course review.
RFCI Initial or Refresher is required!
Class time is from 8-12pm
 

Price: $150.00
Dates: 02/15, 04/16
Qty:
Student Name(s):